Figure 1, Cell Design
We were called in to improve Essilor’s lab operations. A System Design analysis revealed complex flows, long flow times, high rework rates and low labor productivity. We decided that the first step to improving the lab was to design and test out a continuous flow cell with Standardized Work, Pace and Process Control.
The current condition material flow and operator motion are shown in Figure 2 below. There were many material start/stop points, complex flows and operator idle times. Inventory pooled up in many locations. Operators only did one type of work and were very inflexible. In the Target Design (Figure 3 below), material continuously flows one by one through a U-Shaped cell with minimal material handling and operator motion. Figure 4 shows pictures of the Before and After layouts.
The results of this first test were:
The success of this cell led to a complete lean transformation at the lab and a nationwide initiative to transform 20 more strategic labs across the country.
Figure 2, Before Product and Material Flow
Figure 3, After Product and Material Flow
Figure 4, Before and After